Installation

REQUIREMENTS

  1. The Vibrant Woven Vinyl flooring better to be installed by a professional installer.
  2. The sub-flooring should be clean, dry without cracks.
  3. The best instsllation temperature must be height than 15℃ and the relative humidity not higher than 80% A room temperature between 18℃ (65℉) and 25℃ (77℉)

PREPARATIONS

  1. Cutting tools : Shovel/Safety knife/Cutting knife/Trowel
  2. Cutting tools : Vacuum/Map cloth/Shoe cover/Map/Broom
  3. Glue : PVC glue/Cold welding liquid
  4. Other tools : Sand/Heavy roller/Carpenter’s ink market/floor rule/Scotch tape

INSTRUCTIONS (ROLLS)

  1. Apply afterwards a self leveling compound, 24 hours prior to installation. This compound is then grinded and vacuum cleaned. Take heed, depending on the construction of the floor, of the allowed residual humidity and possible rising moisture.
  2. Roll the floor covering out, overlapping for about 5 cm and leave 24 hours to acclimatize. [As P1]
  3. Fold the back over half of their length (or Width) draw a mark as start for the PVC glue Application. Lay the Vibrant Woven Vinyl Flooring on the wet glue and use the heavy
    Roller to remove all air bubbles.
  4. Use the cold welding liquid to weld the seams, Before that must put the scotch tape on the Carpet, cut the tape using the seam. Then fitting the seam by cold welding liquid. [As P2]
  5. After some minutes, check the result.

INSTRUCTIONS (TILES)

  1. Apply afterwards a self leveling compound, 24 hours prior to installation. This compound is then grinded and vacuum cleaned. Take heed, depending on the construction of the floor, of the allowed residual humidity and possible rising moisture.

  2. Leave the tiles 24 hours to acclimatize.
  3. Measure the center of room and mark a line for the PVC glue application. Lay the Vibrant Woven Vinyl Tiles on the wet glue and use theheavy roller to remove all air bubbles. As [P3/ P4]
  4. After some minutes , check the result.